Tuesday, November 1, 2016

Faith United Church of Christ


The two photos below show the parking lot with all concrete poured.  Some finishing touches will be made to fill in dirt and remove items that don't belong.  The lot should be ready for use on Sunday, November 20, 2016.  We thank you for your patience.





Thursday, November 10, 2016
Both sides of the parking lot been poured and finished.  The center section being prepared for concrete.  Looks like we should be able to move back into our parking lot by the end of next week.




Wednesday, November 9, 2016

Two more pictures from today.  Cutting lines in the parking area and putting in forms so that more concrete can be poured.  Keep watching for more progress



Tuesday, November 8, 2016



 Paving in the Parking lot has begun
Two pictures below






November 2, 2016

The three pictures below were taken Wednesday afternoon, November 2, 2016 around
 3 p.m.  More than half of the sidewalk is poured.  It appears the remaining portion of sidewalk will be formed up and poured on Thursday, November 3.  The sidewalk from the parking lot to the church building was formed and poured on Tuesday, November 1 and is getting some finishing touches today.  If all goes well, we should be able to enter our church building on Sunday using the sidewalks from the street to the regular east entrance of the the building.









UPDATE!!!!!
FRONT SIDEWALK POURED ON TUESDAY, NOVEMBER 1, 2016






Here are three pictures from the first pour of sidewalk on Tuesday.


These pictures are taken from the doorway looking toward the parking lot.

Watch this space for more pictures and updates to this long-awaited project.




Our parking lot and sidewalks are under going some changes.  Please be patient with us as we are working to make our parking area and sidewalks even more accessible than before.  Watch this site and our facebook page  www.facebook/FaithUCCIowaCity for more information on our progess.

Please use the on street parking near the church or park in the lot at Mark Twain Elementary.  Access to the church will be through the north door until after the sidewalks are completed.  Thanks for you patience.





Check out the pictures from Monday, October 31, 2016 .  (Left) Front door looking toward the east.


(Right) From the south end of the parking lot looking north to the street.